Day 9 Punctures and Weymouth

 I spent the day before today relaxing with a friend and finding a spring to stop my hand oil pump from being sucked into the tank.

When I left the aim of the day was to ride all the way to Exeter however just before I reached Wool I was riding through the lovely countryside felling like a very slow Lawrence of Arabia when I had another blowout. My new tyre had failed in the same way as on the first day and I had to swap over to my spare which I was luckily carrying. Unfortunately my spare tyre had a cracked side wall and wouldn’t stay on the wheel. This left me a little stranded and I had to find a way to get it fixed. Luckily I was meeting a friend in Weymouth who was able to meet me in Wool where I removed the rear wheel and tyre and took it back to Wareham where a tyre shop was able to put in a gaiter to hold the crack together so the tyre would stay on the wheel. I then got the train back to Wool where I put the tyre back on and was able to go to Weymouth. This all took most of the day so that ended up being the only lifeboat station of the day and I stayed with family on Dorchester which was a nice treat.


Weymouth lifeboat station

My makeshift workshop

On the train with my tyres



My oil pump spring


Comments

Popular posts from this blog

Motorbike shakedown testing

Day 1 (Blowout in Barnet)

Day 2. Tower to Sheerness (6/4/22)